
Friesenstraße 20 | D - 10965 Berlin
Telefon +49 30 695 696 62
Office
Vita
1995 established as “Ingenieurbüro Philipp”
2008 extended into “Ingenieurbüro Philipp und Knoll”
Directors
Dipl.-Ing. Heiko PhilippDipl.-Ing. Matthias Knoll
Special Qualification
H. Philipp is member of The Assossiaction of German Engineers VDI (Verein Deutscher Ingenieure) and official member of Berlin Chamber of Building and ConstructionArea of Expertise
Airconditioning, Refrigerant Plants, Heatpump Systems, Heating Systems, Central Building Control Systems, Sanitary, Public Health, Sprinkler SystemsFocus
Luxury-Retail, Exhibition, Art-Depots, Business and Light Industry , Building Management Systems, Central Cooling and Heating Plants and HydraulicsTeam Size
2-3 Engineers plus Free Lancersyearly volume of projects: 4-6 Mio. €
size of projects: 0,1-1,5 Mio €
Team

Heiko Philipp
Dipl.-Ing. (VDI), Beratender Ingenieur und Mitglied der Baukammer Berlin (P4063)

Matthias Knoll
Dipl.-Ing., Mitglied der Baukammer Berlin
Projects
References
Projects in progress and upcoming
2024 – Emergency Clinic Berlin – BMS
2024 – MONTBLANC Berlin Ku’Damm
2024 – DRK Clinic Berlin Köpenick – BMS
2024 – CHANEL Kopenhagen
2023 – Berlin: ZDF (German Television) – Renewal of Directing Studios
2023 – Berlin: ZDF (German Television) – Renewal of Central Chillers
Finished projects
2023 – CHANEL Düsseldorf
2023 – CELINE München
2022 – Hasenkamp Frechen (Kunstdepot)
2022 – MONTBLANC Düsseldorf
2022 – NIO House – Upper West Berlin
2022 – Berlin: CHANEL Ku’Damm
2022 – Berlin: ZDF (German Television)
2022 – Luxemburg: CHANEL
2022 – Oslo: CHANEL
2021 – Prag: CHANEL2021 – Berlin: BALENCIAGA Kudamm
2020 – Dublin: National Leprechaun Museum
2020 – Berlin: GLOBETROTTER Store
2020 – Berlin: HERMÈS im KaDeWe
2020 – Berlin: HUAWEI Kudamm
2020 – Rust (D): Pavillon NSP2
2019 – Wien: Port4Art / Depot for art ca. 15.000 qm
2019 – Munich: LUSH Spa
2019 – Stockholm: CHANEL
2018 – Berlin: CHANEL im KaDeWe
2018 – Berlin: Hotel Interconti – exchange cooling towers
2018 – Berlin: Australian Embassy Botschaft (Optimizing HVAC-Systems)
2018 – Berlin: emergency hospital – upgrade building automation
2018 – Berlin: LUSH Friedrichstraße
2018 – Berlin: CHANEL Store KuDamm refurbishment
2018 – Kopenhagen: CHANEL Store Kongens Nytorv
2018 – Munich Departement Store Oberpollinger: Bottega Veneta
2018 – Munich Departement Store Oberpollinger: CÉLINE
2018 – Köln: UNIQLO Store ca. 3.500 qm
2017 – Brüssel: Art Storage Depot 8.000 qm (geothermal utilisation)
2017 – Munich: 2. Art Storage Depot Immo-Art 10.000 qm (geothermal utilisation, concrete core activation, full HVAC)
2017 – Munich: CÉLINE Store Maximilianstraße
2017 – Munich Departement Store Oberpollinger: GUCCI
2017 – Berlin: Australian Embassyt – Energetic Optimization Refrigeration
extend view
2017 – Berlin: DIOR Store Ku´damm
2017 – Berlin: emergency hospital – upgrade building automation
2017 – Berlin KaDeWe: GUCCI
2017 – Stuttgart + Oberhausen: LUSH Stores
2017 – Munich, Hannover, Hamburg: TESLA Store und Service
2016 – Munich: CHANEL Maximilianstraße
2016 – Oberhausen, Sindelfingen, Karlsruhe: NESPRESSO Stores
2016 – Berlin: THE GATE (Multi-Media-Center by TRIAD)
2016 – Düsseldorf: ESCADA
2016 – Amsterdam: GUCCI DeBijenkorf
2016 – Stuttgart: UNIQLO
2016 – Metzingen: BOTTEGA VENETA
2015 – Berlin: UNIQLO am Hackeschen Markt
2015 – Munich: TUMI Maximilianstraße
2014/2016 – Dresden: Technische Universität, Upgrading Building Management System
2015 – Düsseldorf: CHANEL
2015 – Frankfurt/M: BOTTEGA VENETA Goetheplatz
2015 – Frankfurt/M: ETRO
2015 – Berlin: UNIQLO Leipziger Platz
2014 – Frankfurt/M: CHANEL Goethestraße
2014 – Vienna: CHANEL
2014 – Prag: BRIONI
2014 – Munic Airport: BURBERRY
2014 – Frankfurt/M: MULBERRY Goethestraße
2014 – Hamburg: MULBERRY Neuer Wall
2014 – Berlin: ETRO Friedrichstraße
2014 – Vienna: Alexander McQueen
2014 – Munich: BRIONI
2013/14 – Vienna: ARTPORT / Neubau Art Storage Depot (full HVAC, concrete core activation, geothermal utilisation, ca. 10.000 qm)
2013/14 – Hamburg: Paul Smith
2013/14 – Hamburg: BRIONI Neuer Wall
2013/14 – Hamburg: CHANEL Neuer Wall
2013/14 – Frankfurt/M: BURBERRY Store Goethestraße
2013/14 – Vienna: BOTTEGA VENETA Tuchlauben
2012 – Berlin: Saudi Embassy / New Pavillon
2013 – Hamburg: BURBERRY Store Neuer Wall
2013 – Frankfurt: BRIONI
2013 – Munic: MULBERRY Store Departement Store Oberpollinger
2013 – Vienna: BRIONI Store in den Tuchlauben
2013 – Vienna: MULBERRY Store
2013 – Vienna: Erweiterung Art Storage Depot Amelar (5.000 qm), concrete core activation, geothermal utilisation, full HVAC)
2012/14 – Berlin: King Fahd Academy (Gymnasium 12 Klassen, Kingdom of Saudi Arabia)
2012/13 – Dresden: TU-Dresden / Integration BMS-system
2012/13 – Berlin: nursing house (ca. 150 Betten) der Johanniter, Tegel-Karolinenstraße
2012/13 – Berlin: Seegalerie / 3 Hafenhäuser (33 Appartements) Tegel-Karolinenstraße
2012 – Berlin: Australian Embassy / Optimising of Chiller System
2012 – Berlin: Louis Vuitton KaDeWe
2012 – Berlin: Yves Saint Laurent KaDeWe
2012 – Berlin: DIOR im KaDeWe, Berlin
2012 – Düsseldorf: TUMI-Store Kö-Passagen
2012 – Berlin: Charité / diverse MSR-Planungen
2012 – Berlin: Apple Store / MSR-Planung
2011/2012 – Donaueschingen – Depot Museum Biedermann
2011 – Riyadh, Saudi-Arabien – PSSO, Prince Salman Science Oasis (Science Museum)
2011 – Frankfurt am Main – MONTBLANC Frankfurt Airport
2011 – Berlin – CHANEL KaDeWe
2011 – Berlin – GUCCI in den Galeries Lafayette, Friedrichstraße
2011 – Hamburg – BOTTEGA VENETA am Neuen Wall
2011 – Berlin – Montblanc-Store, Friedrichstraße
2011 – Berlin – IMAGINARIUM im Quartier 206, Friedrichstraße
2010 – Vienna – KHM, Neubau Depot Kunsthistorisches Museum (full HVAC, concrete core activation, geothermal utilisation, ca. 10.600 qm)
2010 – Vienna – Neubau Art Storage Depot der Fa. Kunsttrans (full HVAC, concrete core activation, geothermal utilisation ca. 9.000 qm)
2010 – Berlin – Bottega Veneta Store am Ku´Damm
2010 – Munic – Bottega Veneta Maximilianstraße
2010 – Düsseldorf – BRIONI Königsalle
2010 – Düsseldorf – Umbau GUCCI
2010 – Amsterdam – GUCCI De Bijenkorf
2009 – Berlin – DOMAQUAREE, Erweiterung DDR-Museum, Entrauchungsplanung
2009 – Berlin – DOMAQUAREE, Befeuchtung Bürogeschosse
2009 – Frankfurt am Main – Polo Ralph Lauren
2009 – Hamburg – Polo Ralph Lauren
2009 – Bonn – MANGO Store
2009 – Heidelberg – MANGO Store
2009 – Mannheim – MANGO Store
2009 – Flechtingen – NP-Markt
2008 – Munic – GUCCI
2008 – Berlinb- KAUFLAND Prenzlauer Berg
2008 – Köln – HASENKAMP Neubau Kunst-Depot mit concrete core activation und Grundwasserwärme-Nutzung sowie Grundwasserkühlung
2008 – Berlin – DÄMMISOL hardware store Ostbahnhof
2006/2009 – diverse Standorte – STOP + GO Werkstätten (Masterplanung)
2007 – Berlin – Getränke-Hoffmann, Neubau des Zentral-Verkaufs am Bahnhof Charlottenburg
2007 – Berlin – Königliche Gartenakademie, denkmalgeschützte Sanierung
2007 – Lübeck – Neubau nursing house „Rosenhof“
2007 – London – NEXUS, Sanierungsplanung Bürogebäude
2007 – Düsseldorf – TIFFANY Store Kö´
2007 – Hamburg: TUMI
2007 – Berlin – Villa Winklerstraße, denkmalschutzgerechte Sanierung einer Villa
2006 – Berlin – LINDAB, Neubau der Produktion am Bahnhof Charlottenburg
2006 – Berlin – Brandschutz-Sanierungsplanung Funkturm Schäferberg
2006 – Berlin – Spreecenter Hellersdorf, Sanierungsplanung
2005 – Dresden – Seniorenpflegeheim am F.C-Weisskopfplatz
2005 – Frankfurt – TUMI
2005 – Berlin – CINEGATE Neubau Zentrallager und Studios
2005 – Berlin – LINDE-Gas, Umbau und Modernisierung des Zentrallagers
2004 – Berlin – Dunkin´Donuts, Neubau der Produktion am Bahnhof Charlottenburg
2000 – Berlin – Leipziger Platz 14
2001 – Hamburg – T-Punkt Business
2000 – diverse Mehrfamilienhäuser
1999 – Berlin – Bauleitung TGA Kulturbrauerei
1998 – Hennigsdorf – Bauleitung TGA Wohnpark Havelpromenade
1998 – diverse Mehrfamilienhäuser (u.a. Geschwister-Scholl-Allee 24)
1997 – Berlin – Bauleitung TGA Wohnpark am Aalemannufer
1996 – Berlin – diverse Strangsanierungen (u.a. Karl-Marx-Allee)
minimize view